Tuesday, February 24, 2009

We are "primed" for a lot of progress

I went by today to check out the house and was very happy to see that the drywall in the basement was being taped and that the walls on the first and second floor have been primed. Above is a shot of the study.
This is a shot of the kitchen.
And above is the living room.
You can see the difference in the ceiling color and the primer. The primer, along with the paint that will be put on, is going to be a low/no VOC (volatile organic compounds) product from Sherwin Williams ( http://www.sherwin-williams.com/pro/green/greensure_designation/).
We can't wait to see the colors we chose up on the walls soon. We stuck with a very traditional arts and crafts palette from Sherwin Williams (http://www.sherwin-williams.com/do_it_yourself/paint_colors/paint_color_palette/color_themes/interior/int_arts/index.jsp)


The house is looking more like a home every day. The wood floors should be delivered in the next day or two. After a couple of days to acclimate they will be nailed in place. The front porch and stairs should be poured either Wednesday or Thursday. Then the front columns can be completed and the true face of the house will be revealed.