
Out at the house today there was a lot of progress to report on the tile work. The fireplace has the grout put in and the slate looks great.

Another shot of the slate.

The tile in the Jack and Jill bath is done too. Looks great. I hope that tile can hold up to bath finger paints!

And last but not least the master shower is well on its way. The floor and the bench have been done.

This is a shot of the floor, that is protected by a bunch of cardboard right now. The bus stop shower will have the maple colored tile put on the walls, the same as the light brown above. It will definitely be a neat look. Can't wait to see it all complete!
No comments:
Post a Comment