So things are flying along at the house. This picture above is to prove that not all the work has been done by our dedicated subs. Amanda and I were at the house Sunday putting together some closets. This is in
Teagan's room. Special thanks to the
Belgeri's for watching the kids and the Baum's for recharging us with refreshments.

Today the plumbers put in their final fixtures, the kitchen faucet and garbage disposal. They also had their final inspection and passed.

Sergei, the finish carpenter, was in the garage putting together our bench and lockers for the mudroom. This is the base of the lockers. Above will have an area for hooks and some storage.

The big
ka-pow today was the glass tile
back splash. It looks amazing. It does a great job pulling the
countertops and moss cabinets together. It should only need grout tomorrow and the kitchen will be nearly complete.
Painting was nearly finished inside when we were there at lunch. It looked like the inside should be done except some
touch ups. Rain is predicted most of the week so I am not sure when the exterior will be painted. The electricians were putting the finishing touches on their work too. They need to hook up the appliances in the kitchen and get
their inspection tomorrow or Wednesday. Our site superintendent Jim is working his tail off getting everything in place for the tradesmen and doing things around the house like hang towel bars and re-assemble vanity doors. It is a lot of work but it seems like it is all coming together quite nicely!
Kitchen looks awesome you guys! Love the moss green and the tile! "More pics, more pics!" From previous posts it sounds like you must be moved in by now??? So exciting, hope all is going well.
ReplyDelete