Painting was nearly finished inside when we were there at lunch. It looked like the inside should be done except some touch ups. Rain is predicted most of the week so I am not sure when the exterior will be painted. The electricians were putting the finishing touches on their work too. They need to hook up the appliances in the kitchen and get their inspection tomorrow or Wednesday. Our site superintendent Jim is working his tail off getting everything in place for the tradesmen and doing things around the house like hang towel bars and re-assemble vanity doors. It is a lot of work but it seems like it is all coming together quite nicely!
Monday, April 27, 2009
Moving Along!
Saturday, April 25, 2009
Other updates from Friday
Amanda and I are planning on going to the house Sunday to start putting together some closets and determine where mirrors and stuff are going to go. Our good friends the Belgeri family are helping us out by watching the kiddos for a while so we can be as productive as possible!
Carpet and Counter Tops!
Thursday, April 23, 2009
Plumbing Fixtures Installed
I will have a lot more pictures tomorrow. The counter tops and carpet are installed. The concrete walkways will be done and maybe a little more finish work inside. The first floor should have most of the painting done too!
The Driveway!
Front porch almost done
That is just the front of the house. I have a couple more posts on the rest of the progress.
Thursday, April 16, 2009
Shower tile done and paint upstairs
Believe it or not we have been told that we should be done on April 30th. We are very excited to finally get into the house. A lot of work still needs to be done but we are confident the guys can do it!
Sunday, April 12, 2009
Happy Easter!
We went by the house yesterday after a day at the zoo. Everything is coming along nicely. Above is a shot of the fireplace area without a big door in the way.
Wednesday, April 8, 2009
Upstairs update
Stay tuned for updates later this week!
On the first floor